Irene M. Snow Elementary School
The State does not provide the funding necessary to complete identified repairs and improvements in Napa schools. Thus, the NVUSD Board of Trustees unanimously approved placing a $230 Million bond measure on the November 2024 ballot to address these needs. Funding from a bond measure could address the needs listed here. Items marked as "complete" have already been addressed. Items marked as "yes" could be addressed by Measure B, if passed.
Item Number | Description | Irene M. Snow Elementary School |
1 | Campus critical system modifications including roof, exterior paint, heating, ventilation and air conditioning (HVAC), and paved areas necessary to meet Americans with Disabilities Act. | Completed |
2 | Replace outdated fire alarm and replace with modern fire alarm that meets the most recent code requirements | Completed |
3 | Replace public address system and emergency communication system | TBD |
4 | Classroom and interior building remodel including paint, ceiling tile, carpet, counters (where needed), and flooring in common areas such as hallways | Completed |
5 | Classroom furniture such as mobile student furniture that is grade span specific, teacher furniture including stand-up desks, and furniture for specific spaces such as libraries and offices. | Yes |
6 | Replace and restripe playground blacktop areas (where needed) | Completed |
7 | Replace and upgrade playground equipment | Completed |
8 | Various critical site infrastructure upgrades based on site specific needs based on budget | Completed |
9 | Technology to enhance learning in the classroom and critical technology infrastructure and safety needs based on budget | TBD |
10 | Removal of hazardous materials as part of work completed | Completed |
11 | Removal of end of life portables that are not needed | Completed |