Stonebridge Charter School
The State does not provide the funding necessary to complete identified repairs and improvements in Napa schools. Thus, the NVUSD Board of Trustees unanimously approved placing a $230 Million bond measure on the November 2024 ballot to address these needs. Funding from a bond measure could address the needs listed here. Items marked as "complete" have already been addressed. Items marked as "yes" could be addressed by Measure B, if passed.
| Item Number | Description | Stonebridge Charter School |
| 1 | Campus critical system modifications including roof, exterior paint, heating, ventilation and air conditioning (HVAC), and paved areas necessary to meet Americans with Disabilities Act. |
Yes |
| 2 | Replace outdated fire alarm and replace with modern fire alarm that meets the most recent code requirements | Completed |
| 3 | Replace public address system and emergency communication system | TBD |
| 4 | Classroom and interior building remodel including paint, ceiling tile, carpet, counters (where needed), and flooring in common areas such as hallways | Yes |
| 5 | Classroom furniture such as mobile student furniture that is grade span specific, teacher furniture including stand-up desks, and furniture for specific spaces such as libraries and offices. | TBD |
| 6 | Replace and restripe playground blacktop areas (where needed) | TBD |
| 7 | Replace and upgrade playground equipment | Yes |
| 8 | Various critical site infrastructure upgrades based on site specific needs based on budget | Yes |
| 9 | Technology to enhance learning in the classroom and critical technology infrastructure and safety needs based on budget | Not Applicable |
| 10 | Removal of hazardous materials as part of work completed | Yes |
| 11 | Removal of end of life portables that are not needed | Completed |
For additional information visit www.nvusd.org.
